Liquidated damages
1.  K can stipulate damages or method of fixing damages
2.  K cannot provide for a penalty
3.  Two different tests to determine validity of agreement
a.  The amount of possible damages from any later breach is                     difficult to determine
b.  The K provision is a reasonable forecast of possible damages
i.  Always be suspect of single sums on the exam